Tuesday, November 24, 2009

Master Bath Makeover #3



This is what the floor looked like with the spacers in it. The floor was allowed to set for 24 hours before the grout.


This is the floor grouted. The plumbing is set up for two face bowls.


This is the view towards the shower. The linen closet is the door on the left.

Toilet area. Shower is on the right.
Tub is in the foreground.



This is looking into the closet.


Finished floor without baseboards.

Finished floor looking towards the sinks.

Looking towards sinks.


Toilet area.

Finished floor in closet.

Finished floor in closet.